• http://iliriadapks.com/wp-content/uploads/2015/02/shkoder11.jpg
  • http://iliriadapks.com/wp-content/uploads/2015/02/shkoder21.jpg

The Project aims to ensure a sustainable, ecologically and hygienically safe water supply and wastewater collection in the city of Shkodra. This is to contribute to the environmental protection of the lake, conservation of the natural resources, reduction of the health risks of the city of Shkodra’s population and its visitors. Construction Supervision of Works for the Water Supply and Wastewater System Shkodra (rehabilitation works and new construction; “Water and Sewerage Shkodra”); Construction Supervision of Works for the Wastewater System Shiroke (new construction of sewer network and WWTP; “Sewerage and WWTP Shiroke”); Construction Supervision of Installation Works of total approx. 15,500 Water Meter (“Installation of Water Meters”); all Works Contracts are based on FIDIC Red Book;
Service Value: approx. 3.2 MEUR
Approx. total value of Works: 23.0 MEURless

Starting Date: 11 January, 2010