Preparation and execution of geotechnical studies and topography.
Review all existing documentation, and assessment situation for all engineering networks, and their lines of passage on the ground, where lacked documentation
Preparation of the final detailed design of 18Km Highway.

Starting Date: 01 March, 2012
Ending Date: 012013